Laying out tire and jerry can swing carrier.

Posted: Sun Jun 04, 2017 4:58 pm
by Sonarman
I am planning on moving my spare tire off the tail gate. While I am at it want to be able to carry two more fuel/water containers. Waiting for axle spindal to arrive for pivot point. I don't like the weight of the tire on tail gate since the 3rd world California roads are tearing the latch up.
IMG_1604.JPG
IMG_1604.JPG (110.11 KiB) Viewed 6022 times
IMG_1605.JPG
IMG_1605.JPG (110.17 KiB) Viewed 6022 times

Re: Laying out tire and jerry can swing carrier.

Posted: Sun Jun 04, 2017 5:59 pm
by undysworld
Sonarman wrote: the 3rd world California roads are tearing the latch up.
I guess you haven't been to Wisconsin lately, huh? :cry: Say "goodnight" to your ball-joints. The only good part is that it shakes the rust off!!

Re: Laying out tire and jerry can swing carrier.

Posted: Sun Jun 04, 2017 7:50 pm
by Haf-e
Seems like a lot of weight on a single pivot. How about two swing outs - one for the spare and one for the fuel cans? Could even be done Rapier style where they meet in the middle?

Re: Laying out tire and jerry can swing carrier.

Posted: Sun Jun 04, 2017 8:08 pm
by 4x4Pinz
I have been running a dual jerry can and spare tire on a built rear bumper for a long time. On longer adventures I even hang a jerry can on the spare tire. Of course the two main jerry cans are for water (we do live in a desert here) and I have the extended range fuel tank already. I did have to add an additional swing point to stabilize the carrier. It moved too much for my liking and I figured over time it would destroy something. I do use my truck offroad a lot and on trails that are not traveled as much as most.

Re: Laying out tire and jerry can swing carrier.

Posted: Sun Jun 04, 2017 8:10 pm
by 4x4Pinz
one piece of advice I can give you that I had to go back and add is a way to lock the swing open. Don't always park on level ground and having the ability to hold open the swing is nice.

Re: Laying out tire and jerry can swing carrier.

Posted: Tue Jun 13, 2017 4:25 pm
by Sonarman
For my next part in process I drilled pilot hole for 1.25 inch hole saw to cut in spindle sleeve. I am using spindle sleeve to eliminate a lot of welding heat on spindle itself which could cause it to crack.]IMG_2449.JPG[/attachment] I will cut the flange off the hub then weld the hub to the actually swinging part of carrier 2x3 box tubing. As usual pics are out of order. More pictures to follow as process comes along. Ran out of time since I wanted to get front brakes adjusted and wheels drilled out for new lug nuts.

DYI spare tire and jerry can swing carrier.

Posted: Wed Jun 14, 2017 9:49 am
by Sonarman
IMG_2453.JPG
IMG_2453.JPG (617.79 KiB) Viewed 5877 times
Got the flange removed from the hub and used plasma cutter to cut a half circle in swinging part of carrier that will be welded to the hub.
Got the 1.25 inch holes for mounting the spindal sleeve. Boy, that was some tough old American steel to drill through!

Re: Laying out tire and jerry can swing carrier.

Posted: Wed Jun 14, 2017 4:43 pm
by 4x4Pinz
seems like a lot of work when you can just buy one of these.
https://www.polyperformance.com/synergy ... le-3-0-od/

Re: Laying out tire and jerry can swing carrier.

Posted: Wed Jun 14, 2017 7:34 pm
by VinceAtReal4x4s
How much do you think that weighs?

Re: Laying out tire and jerry can swing carrier.

Posted: Wed Jun 14, 2017 9:01 pm
by Sonarman
I am trying to keep the tire carrier under 100lbs and under 100 dollars hence using steel I had available.

Re: Laying out tire and jerry can swing carrier.

Posted: Sat Jun 17, 2017 2:43 pm
by Sonarman
More pictures. Decided not to use cast hub to weld to. Found this giant nut to machine out. I will incorporate the existing tire carrier into new mount.

Re: Laying out tire and jerry can swing carrier.

Posted: Wed Jun 28, 2017 6:11 pm
by Sonarman
Updated pictures

Re: Laying out tire and jerry can swing carrier.

Posted: Thu Jun 29, 2017 3:45 pm
by GadgetPhreak
Looking good!


Sent from my iPhone using Tapatalk

Re: Laying out tire and jerry can swing carrier.

Posted: Thu Jul 06, 2017 3:08 pm
by Sonarman
IMG_1731.JPG
IMG_1731.JPG (121.67 KiB) Viewed 5539 times
Did some more welding, sandblasting and mocking up highlift jack mount today. Waiting for toggle clamp to arrive so I can finish up welding and get it primed.

Re: Laying out tire and jerry can swing carrier.

Posted: Mon Jul 17, 2017 11:17 pm
by Sonarman
Almost ready for paint.