Engine now in place on new engine mounts.

Long discussion on ROLL CAGE etc and positioning of SOLAR battery and they 12V battery box.
New hinges made for engine cover so it no longer slides out and fills the cabin with hot air.
Power steering filler mounted in a easy to get to place
Intercooler purchased and ready to mount (very nice unit will take pic when in place) to fit behind the passenger cabin seat and has own fan etc built in.
Custom 3 core radiator to come from the USA as the local builder decided to build us something we did not want and offerred us a $100rm ($30usd) discount and was told to stick the poorly made radiator back in his car and leave - fool lost out on 3 as we needed the same one for 2 other trucks hahaha fool.
Fuel tank to be build this week on left hand side some 170-200+ liters (40-50US Gallons) and construction of the roll cage will commence and the bar for the harness seat belts to be made and fitted also.
12volt Alternator to also be fitted next week.